Plan, Hawke's Bay Rivers Board, diversion of the Tutaekuri River
Maker
Hay, F C
Hay, F C
Production date
23 Jul 1924
Object detail
Brief Description
Plan of Hawke's Bay Rivers Board, diversion of the Tutaekuri River.
Plan D. Forty chains to the inch.
Showing different proposed routes for the river and their costs.
A plan accompanying F. C. Hays report of July 1924. Eight sheets connected together by metal clips.
Plan and elevation. Shows Meeanee, South of Awatoto where the river mouth is, Clive, Redcliffe Bridge where the river runs and spillway. This plan shows the proposed route ending up South of Redcliffe.
Shows the cost of the proposition:
Capital cost including work at Moteo - £120,900.
Period of construction - 3 1/2 years.
Length from point P, near Redcliff Bridge to sea - 5 miles 32 chains.
Free hydraulic gradient - 7.9 feet per mile.
Yearly cost £7,980.
Plan D. Forty chains to the inch.
Showing different proposed routes for the river and their costs.
A plan accompanying F. C. Hays report of July 1924. Eight sheets connected together by metal clips.
Plan and elevation. Shows Meeanee, South of Awatoto where the river mouth is, Clive, Redcliffe Bridge where the river runs and spillway. This plan shows the proposed route ending up South of Redcliffe.
Shows the cost of the proposition:
Capital cost including work at Moteo - £120,900.
Period of construction - 3 1/2 years.
Length from point P, near Redcliff Bridge to sea - 5 miles 32 chains.
Free hydraulic gradient - 7.9 feet per mile.
Yearly cost £7,980.
Maker
Production date
23 Jul 1924
Production place
Production period
Production technique
Media/Materials description
Hand drawn on linen with ink. Eight sheets connected together by metal clips.
Media/Materials
Measurements
Height x Width: 600 x 775mm
Classification terms
Subject person
Subject period
Subject date
23 Jul 1924
Other number(s)
7296, 76700
Public comments
Be the first to comment on this object record.