Plan, Tutaekuri suspension bridge

Maker
Hawke's Bay County Council
Puflett, R
Production date
10 Sep 1929

Object detail

Brief Description
Two plans joined together of the proposed strengthening work to the suspension bridge over the Tutaekuri River at Puketapu.

a) The plan shows a sketch elevation of the Tutaekuri bridge from the upstream side, a general sketch plan, the towers and the block and casting.

b) The plan shows the anchors at the Moteo and Puketapu end of bridge, detail of block work, elevations, method of fastening hanger rods to the steel transoms, method of fastening between anchors and cables at the Moteo end.

Date, 10 September 1929.
Production date
10 Sep 1929
Production period
Production technique
Media/Materials description
Waxed linen architectural drawing paper; black ink. Hand drawn. Two sheets stapled together.
Measurements
Height x Width: 510 x 760mm
Subject period
Subject date
Sep 1929
Other number(s)
6406, 33633

Share

Public comments

Be the first to comment on this object record.

Google reCaptchaThis site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.